5 billion Investment! 5000t/d waste incineration power generation! Publicity of a large circular economy industrial park in Wuhan.
According to the website of Wuhan Xinzhou District Natural Resources and Planning Bureau, on May 9, the planning and design scheme of Xinzhou District Circular Economy Park (solid waste comprehensive disposal base) project was publicized before approval.
According to the publicity, after examination and approval, it is proposed to approve the planning and design scheme of the Xinzhou District Circular Economy Park (solid waste comprehensive disposal base) project of Wuhan Environmental Investment and Development Group Co., LTD., located in Jianqun Village and Chunguang Village, Liji Street, Xinzhou District, The project plans to build renewable resource power generation center, centralized sewage treatment center, organic matter and solid waste comprehensive disposal center, supporting engineering and resource utilization phase II and other functional plates.
The construction content is 1 household waste incineration power generation plant, 1 circulating water pump room, 1 slag resource workshop, 1 sludge dewatering room, 2 comprehensive pools, 1 comprehensive workshop, 1 pretreatment workshop, 1 digestate dewatering workshop, 1 biogas power generation workshop, 1 auxiliary room, 2 guards room, 1 loadometer room, 2 pump rooms, 1 fire pump room and pool, 1 building Management center, 1 dormitory building and rainwater collection pool, pressurized pumping station, torch, anaerobic tank, inlet and outlet material tank and gross oil tank and other structures.
It is reported that Wuhan Xinzhou District Circular Economy Park (solid waste comprehensive disposal base) project with a total investment of 5,078.84 million yuan, plans to build a comprehensive solid waste disposal circular economy park, Including 5000t/d renewable resource power generation center, 250t/d municipal sludge (60% moisture content) cooperative incineration disposal, 700t/d organic matter solid waste comprehensive disposal center (including 500t/d household kitchen waste and 200t/d kitchen waste), 150t/d renewable resource recycling and utilization center, At the same time, supporting construction of fly ash landfill, slag resource sewage centralized treatment and management and living center and other auxiliary projects and external supporting projects.
The investment and construction unit of this project is Wuhan Environmental Investment and Development Group Co., LTD. In October 2023, Wuhan Environmental Investment Group publicly bid for the EPC general contract project of renewable Resource Power Generation Center in Xinzhou District Circular Economy Park (solid waste comprehensive disposal base), which was jointly contracted by MCC Southern Urban Environmental Protection Engineering Technology Co., LTD and Wuhan Municipal Environmental Engineering Construction Co., LTD., with a cost of about 2.052 billion yuan and a construction period of 730 calendar days.
In November 2023, the supporting works of Xinzhou District Circular Economy Park (solid waste comprehensive disposal base) project officially started, and fully entered the accelerated construction stage.
The core area of the project covers an area of 705 mu. It is another solid waste comprehensive disposal strategic guarantee base and resource recycling demonstration base with large construction scale, advanced treatment technology and high environmental protection level in central China after Qianzishan Circular Economy Industrial Park. This project is the largest household waste incineration power generation project planned and under construction in Wuhan. The scale of grate incinerator is 1000t/d per furnace, and the waste heat boiler adopts medium temperature ultra-high pressure steam parameters (450℃, 13.7MPa), which is the largest unit with single furnace in China.
Source: https://mp.weixin.qq.com/s/Pj7WDYx1tSOZR40USmjJvw